CRMWA uses unspent bond funds for a CRMWA II route study and easements
CRMWA states that in 2013 it used unspent bond funds to hire an engineering firm for a route study and then to acquire easements for building CRMWA II. The sources reviewed do not name the firm, the bond issue or the amount spent.[1]
CRMWA states that in 2013 it used unspent bond funds to hire an engineering firm to perform a route study and then to acquire easements for the construction of CRMWA II. The sources reviewed do not name the firm, the bond series or the amounts.[1]